BES-TEX Supply, LLC
325.653.1300
BES-TEX Best Management Practices · New Lawn
Know the site. Prepare the soil. Have water ready.
A homeowner’s sod installation guide for San Angelo and Central West Texas
Sod gives you green coverage quickly. A lasting lawn starts earlier: choose grass for the site, prepare the soil, and have water ready before delivery. Finish the groundwork before the pallet arrives.
1 · Choose
Bring photos and describe sunlight, foot traffic, irrigation and how much mowing you want to do. Cultivars within a species differ.
Shade tolerance does not mean a grass will thrive in deep shade. Assess the actual sunlight on the site. Discuss difficult shaded areas before buying sod.
Site preparation before sod is laid. Company photograph from the current New Lawn page. This image shows prepared soil, not a named cultivar or a finished lawn.
2 · Measure
Sketch the planting area. Divide it into rectangles, multiply length by width in feet, add the sections, and subtract beds, paving and other areas not being sodded. Ask for help measuring curves.
Square feet = length × width. Allow extra for trimming and irregular edges, based on the supplier’s recommendation. Pallet coverage varies by variety and supplier; confirm the actual square feet per pallet rather than assuming every pallet is the same.
Call early with your area, preferred grass and installation date. Confirm availability, current price, pallet coverage, pickup or delivery arrangements, and what services are included. Sod supply does not automatically include grading or installation.
3 · Prepare
Ready check: soil prepared, drainage checked, irrigation tested, help arranged. Warm-season sod roots fastest while actively growing.
4 · Install
Sod is perishable. Arrange to lay it promptly after delivery; ask when it was harvested. Texas A&M advises installation within 36 hours of harvest, sooner in hot weather. That is an outside guideline, not permission to leave a pallet sitting in the heat.
Start along a straight edge. Lay staggered rows like brickwork, with edges snugly butted, not overlapped. Trim around beds and paving. Minimize traffic and wheelbarrow ruts in the prepared soil.
After laying, roll with a suitable sod roller to reduce air pockets and improve soil contact. Avoid working saturated soil. Water promptly; do not let newly laid pieces dry while the rest of the job waits.
5 · Water
At installation: wet the sod and underlying soil, not just the leaves. Lift corners in several locations to check that water has reached the soil beneath. Texas A&M publications describe initial wetting depths of approximately 2 to 4 inches.
While rooting: keep the sod and root zone moist, not saturated. Inspect beneath pieces and adjust for heat, wind, rain, soil and coverage. Hot weather can require daily watering; cool conditions may need less. Let conditions, not a fixed calendar, set the schedule.
As roots develop: gradually lengthen the time between waterings and wet deeper into the developing root zone. Once well rooted, move toward deeper, less frequent irrigation. Do not keep an established lawn on a new-sod schedule. Check current local watering rules before installation and arrange any required authorization.
Our watering approach. For brand-new sod, BES-TEX favors an open hose with the flow gentle and moving. Wet every piece and the soil beneath; pause if water runs off or washes soil away. A shower-style wand works well for established lawns.
New sod: open-hose watering
Established lawn: shower-style spray
6 · Establish
Begin mowing when sod is rooted and the soil is firm enough to avoid ruts. Use a sharp blade and the mowing height appropriate to the grass and cultivar. Remove no more than one-third of the leaf blade at one mowing. Rooting and growing conditions, not a guaranteed number of days, determine readiness.
Base fertilizer selection on soil-test needs, grass type and active growth. There is no universal need for 12-24-12 or a fixed weekly feeding calendar. Keep fertilizer off pavement and out of runoff. New sod can be sensitive to herbicides; use only products labeled for that grass and establishment stage.
Bring your plan. We will help you check it. Bring measurements, sunlight photos and a soil test. One-pallet minimum; Mon-Fri 8 a.m.-5 p.m. Central; delivery extra. Call to confirm price and availability.